От Stalker Ответить на сообщение
К Colder Ответить по почте
Дата 05.12.2001 20:53:27 Найти в дереве
Рубрики WWII; Современность; Версия для печати

Вот

Здравствуйте


"Next batch is on schedule for WW49 shipment - all lots are at Sort. DPAS closed 97% 33/34 - @@@ schedule was missed by @@ units, as lots are being held due to suspected PI fissures on the scribe lines (precaution - wafer sale material). @@@ engineering focus continues to be in BE defects reduction: this week, wafer boats as possible source of defects, and litho print map experiments to resolve @@@ particles. @@@ with new pace record of 1.34/1.2 WT and @@@ keeps its flawless performance (2.14 WTs, 682 ISO, 96% LY)."
С уважением